After Project Checklist
Walk-through, touch-up paint, and warranty paperwork — what to confirm before the crew packs out.
Final walk-through
- Walk every room or elevation in daylight with the project lead.
- Check corners, ceilings lines, trim returns, and behind doors.
- Use painter's tape to flag any touch-ups before signing off.
Documentation to collect
- Labeled touch-up paint for each color and sheen used.
- Final color, brand, and product line list for your records.
- Signed workmanship warranty with start date and exclusions.
- Final invoice marked paid and lien waiver if a deposit was held.
Within 30 days
- Re-walk the project once your furniture is back in place.
- Report any settling cracks, drips, or missed spots to the painter.
- Leave an honest review — it helps other Minnesota homeowners.